P&O Arvia
Name Arvia
Owner Carnival Corporation & plc
Operator P&O Cruises
Port of registry Southampton, United Kingdom
Builder
Yard number S. 716
Laid down 15 February 2022
Launched 27 August 2022
Sponsored by Nicole Scherzinger
Christened 16 March 2023
Completed 15 December 2022
Acquired 15 December 2022
Maiden voyage 23 December 2022
Status In service
General characteristics
Class and type Excellence-class cruise ship
Tonnage 185,000 GT
Displacement 87,306 t (85,927 long tons; 96,238 short tons)
Length 344.5 m (1,130 ft 3 in)
Beam 42 m (137 ft 10 in)
Draught 11.8 m (38 ft 9 in)
Decks 16 complete, 3 partial
Installed power Total Installed Power: 61.7 MW (82,700 hp)
Propulsion 2 × 18.5 MW (24,800 hp)
Speed Service speed: 22 knots (41 km/h; 25 mph)
Capacity 5,200 passengers
Crew 1,800
Owner Carnival Corporation & plc
Operator P&O Cruises
Port of registry Southampton, United Kingdom
Builder
Yard number S. 716
Laid down 15 February 2022
Launched 27 August 2022
Sponsored by Nicole Scherzinger
Christened 16 March 2023
Completed 15 December 2022
Acquired 15 December 2022
Maiden voyage 23 December 2022
Status In service
General characteristics
Class and type Excellence-class cruise ship
Tonnage 185,000 GT
Displacement 87,306 t (85,927 long tons; 96,238 short tons)
Length 344.5 m (1,130 ft 3 in)
Beam 42 m (137 ft 10 in)
Draught 11.8 m (38 ft 9 in)
Decks 16 complete, 3 partial
Installed power Total Installed Power: 61.7 MW (82,700 hp)
Propulsion 2 × 18.5 MW (24,800 hp)
Speed Service speed: 22 knots (41 km/h; 25 mph)
Capacity 5,200 passengers
Crew 1,800